Church Renovations
Grace Community Church services are conducted at the CPAC Theater
building, a fully restored and technologically modernized
Victorian-trimmed early 20th-century facility complete with theater
seating, lighting, sound and projection capabilities. The facility was
renovated from a historic church over the past two decades. Read more about the facility.

When the facility was purchased in 1992 it had gone many
years without renovations. Included in the initial renovations
was the removal of a leaky car transmission from the
sanctuary floor :)

Original rear parking lot view. 1992

Original rear of facility. 1992

Original facility interior. 1992

When we pulled off the old metal siding from the
entry foyer exterior we found original ship-lathe
wood siding which was painstakingly restored.

The early restored facade of the facility.

Wood trim being applied over metal trim.

Interior walls being covered with fresh new drywall and paint.

Brushing on the facade sealer coat.

The facade after the antique ginger-bread trim renovations.

A covered wood walkway ramp
being built for the facility rear entrance.

We accept all volunteers!

A new roof being built for the back porch.

The interior of the renovated facility today.

The exterior of the renovated facility today.

Exterior before, 1992, and after, 2010.

Interior before, 1992, and after, 2010.
Back to PHOTOS main page ...